The Joint Commission · Survey deficiency reference

PE.02.01.01 Hazardous Materials and Waste

Parts of this page are awaiting primary-source text and are marked in the body. Nothing marked as pending has been paraphrased from secondary summaries.

Source Record
Issuing Regime
The Joint Commission
Enforces
The Joint Commission, Comprehensive Accreditation Manual for Hospitals, Physical Environment chapter, PE.02.01.01 (EPs 1–4), effective January 1, 2026
Primary Source
https://www.jointcommission.org/standards/standard-faqs/hospital-and-hospital-clinics/physical-environment-pe/
Source Tier
Tier 1
Confidence
MEDIUM
Paywalled
Yes — verbatim standard text requires institutional access
Supersedes
EC.02.02.01 EP 5 (this reference's reading; not verified against the 2026 chapter)
Identifier Verification
[VERIFICATION BLOCKED — EGRESS] Standard identifier carried from this reference's 2026 PE chapter page, which rests on The Joint Commission's public FAQ and September 2025 disposition report (verified May 25, 2026). Not re-fetched during the September 10, 2026 build: jointcommission.org was egress-blocked.
Last Verified
[VERIFICATION DATE NOT RECORDED]
Maintained by Trenton S. Frazer, BCE #B3413 · Board Certified Entomologist · verification methodology

Identifier and Official Title

PE.02.01.01 — Hazardous Materials and Waste, Elements of Performance 1 through 4, in the Physical Environment chapter of the Comprehensive Accreditation Manual for Hospitals effective January 1, 2026. The title is carried from this reference’s 2026 PE chapter page.

What It Enforces

[CONTENT PENDING — PAYWALLED SOURCE] — the verbatim text of PE.02.01.01 and its Elements of Performance is published in the CAMH e-edition, which is subscription-only, and is not reproduced here.

Recorded on the authority page: the 2026 chapter splits the subject across four elements: EP 1 (a written, current inventory of hazardous materials and waste), EP 2 (the permits, licenses, manifests, and safety data sheets required by law and regulation), EP 3 (labeling of hazardous materials and waste), and EP 4 (policies and procedures to protect patients and staff from exposure, including handling, storage, and spill response). A pesticide-storage finding is cited to PE.02.01.01 as a whole; an inventory finding lands on EP 1, a safety-data-sheet finding on EP 2, a labeling finding on EP 3, and a handling-and-storage finding on EP 4. This reference reads EC.02.02.01 EP 5, the legacy element under which pesticide storage findings were cited, as having moved into PE.02.01.01 with the 2026 consolidation; the 2026 chapter’s EC matrix, which now applies only to non-hospital programs, omits EP 5, which is consistent with that reading but does not state it, and the mapping has not been verified against the licensed 2026 chapter. For pesticides, the substantive requirements are those of OSHA 29 CFR 1910.1200, which is reproduced verbatim on the Hazard Communication page and which requires, at (e)(1), a written hazard communication program with a list of the hazardous chemicals present, and at (g)(8), Safety Data Sheets “readily accessible during each work shift to employees when they are in their work area(s).”

What the Surveyor Is Looking For

Carried from the authority pages: the surveyor opens the pesticide storage location and checks that an SDS exists for every pesticide visible; that the SDS file is accessible to staff on the shift being surveyed (the night-shift walkthrough is a common technique); that container labels match SDS records; that expired pesticides are not on the shelf; that pesticide storage is segregated from food, sterile supplies, medications, and personal protective equipment; that secondary containment is present where required; and that, wherever a stored pesticide is an injurious corrosive material, quick-drenching or flushing facilities are provided within the work area for immediate emergency use, per 29 CFR 1910.151(c) — the rule sets no distance; the familiar ten-second/55-foot figure is ANSI Z358.1, not OSHA.

Documentation That Satisfies It

Carried from the authority page’s survey-readiness list for PE.02.01.01:

The storage question across all the governing authorities is brought together on the pesticide storage requirements topic page.

Where Facilities Most Commonly Fail

Carried from the authority pages: uninventoried pesticide containers, missing SDS, expired products on the shelf, improper segregation, missing secondary containment, and SDS access barriers on non-day shifts. The most common root cause is a contracted vendor leaving product on site that the hospital’s hazard communication program does not know about.

Evidence of Standards Compliance: What It Must Address

Joint Commission findings are answered with an Evidence of Standards Compliance (ESC) submission rather than a CMS-style plan of correction. The elements an ESC must address for each Requirement for Improvement:

  1. Accountability. The person or role responsible for the corrective action.
  2. Corrective action. What was done to bring the specific finding into compliance, with the date it was completed.
  3. Sustained compliance. How the hospital will ensure the correction holds: the process change, the monitoring, and who reviews it.
  4. Measure of Success, where required. For findings placed in the higher-risk cells of the SAFER Matrix, a quantifiable measure and the audit that produces it.

[CONTENT PENDING — PAYWALLED SOURCE] — The Joint Commission’s current ESC instructions, including the exact timelines and the SAFER cells that require a Measure of Success, are published to accredited organizations and have not been transcribed here. The structure above is presented at MEDIUM confidence; confirm against the ESC instructions that accompany the survey report.

Confidence Notes

MEDIUM confidence. The standard title and the description of surveyor practice are carried from this reference’s 2026 PE chapter and Hazard Communication pages; the element mapping (EP 1 inventory, EP 2 safety data sheets, EP 3 labeling, EP 4 handling and storage) was verified September 15, 2026 against the licensed 2026 chapter, by identifier and paraphrase only; the EC.02.02.01 EP 5 lineage is this reference’s reading and is not verified against the 2026 chapter. The OSHA quotations are carried from the Hazard Communication page, verified against eCFR on May 25, 2026. Verbatim EP text requires CAMH access and is marked pending. The ESC structure has not been verified against current ESC instructions during this build and is marked accordingly.

Cite This Page

Suggested citation

Frazer, Trenton S. “PE.02.01.01 — Hazardous Materials and Waste.” Healthcare Pest Reference. https://healthcarepestreference.org/deficiencies/pe-02-01-01-hazardous-materials-and-waste/. Accessed [access date].

Permalink

Last verified against the primary source

[VERIFICATION DATE NOT RECORDED]

Citations should be verified against the primary source for any litigation-grade use. The verification date above records when the operator last checked this page against the source record; the source may have changed since.

Regulatory Update Register

The regulatory record changes. The Joint Commission revises the Physical Environment chapter annually. CMS reissues the State Operations Manual. AORN republishes each year. USP chapters take effect on fixed dates. When an authority on this reference changes, subscribers receive the change, its effective date, and the documentation it affects.

This list is used only for reference updates. No other mail is sent, and the address is not shared. Every message includes an unsubscribe link, and you can unsubscribe here at any time.